top of page
PULL THROUGH TEST FACILITY
IMG_2323
1/4
​
-
Tool calibration, pre-commissioning exercise MFL data or Caliper data evaluation.
-
On-site data completeness and integrity assessment.
-
Clients can witness a full test of our MFL tool prior to site mobilization.
-
Automated or manual data evaluation.
-
Detailed assessment of detected defects and its complete characteristics; location, dimensions, category, signal log and contour plot.
​
Loop Test / Pull Through in Thailand
1/6
The 14" Pull Through Test for PTTEP ( Thailand ) at 28 June 2017, runs for 4 times with 0.5 ms, 1.0 ms, 1.5 ms and 2.0 ms velocity. This PTT are meant for technical clarification in order for open bidding next year.